Project
NHA Thatta project
PM 2021 22 SS 03 Periodic Maintenance (Functional Overlay)
Km 100 to 120 (N5/KTHH) Makli to Thatta to Sonda
Under the National Highway Authority’s PM 2021–22 program, QKC executed the Periodic Maintenance (Functional Overlay) from Km 100 to 120 on N-5/KTHH, covering the Makli to Thatta to Sonda section. The project enhanced road durability, driving comfort, and safety through high-quality functional overlay works, ensuring smooth connectivity on this vital transportation corridor.



